ppr管热熔操作
热熔器接通电源,PVC管业加工,到达温度指示灯亮后方能开始操作。
切割管材必须使端面垂直于管轴线,管材切割一般使用管子剪,PVC管业生产,如为大管径,则用锯条切割,切割后断面去毛刺和毛边。
Hot melt operation of PPR pipe
The heat melt can be operated after the power is turned on and the temperature indicator light is on.
The end face of the pipe must be perpendicular to the pipe axis. Pipe cutting is generally used. If the pipe diameter is large, it is cut with a saw blade. After cutting, the sected shall be deburring and burr free.
·安装完毕后的试压工作,试验压力为工作压力的1.5倍,且压力值不得小于0.6MPa,东城区PVC管业,测试时间约20-30分钟。
·管材安装要遵循“水走天”原则,避免后期维护损害管道。
·安装过程中要及时封住管材开口处,避免杂物进入管道系统
Tips for PPR tube installation
·After installation, the test pressure is 1.5 times of the working pressure, and the pressure value shall not be less than 0.6MPa, and the test time is about 20-30 minutes.
·Pipe installation chould follow the principle of "water goes to the sky" to ***oid damage to the pipe during later maintenance.
·In the process of installation, the opening of the pipe should be sealed in time to ***oid impurities entering the pipe system
现在PPR水管的熔焊器制作合格的不多,因为一是缺少部件;二是生产厂家为了节省材料,一些厂家的底座采用很薄的白铁皮,造成上重下轻而不稳。操作时,往往需要另一个工人帮助稳住。
At present, there are few qualified welding tools for PPR water pipes because of the lack of parts; Second, in order to s***e materials, some manufacturers use very thin sheet iron for the base, which makes the top he***y and the bottom light and unstable. When operating, it often needs another worker to help stabilize.
Gafloon卡弗龙(图)-PVC管业生产-东城区PVC管业由台州艾菲力塑胶有限公司提供。台州艾菲力塑胶有限公司实力不俗,信誉可靠,在浙江 台州 的塑料管等行业积累了大批忠诚的客户。艾菲力塑胶带着精益求精的工作态度和不断的完善创新理念和您携手步入辉煌,共创美好未来!同时本公司还是从事PPR管,地暖管,PVC管的厂家,欢迎来电咨询。