Casino验厂审核清单
1.Quality department(质量部):
(1).IQC non-check components list(IQC***物料清单)
(2).Quality meETIng record(质量会议记录)
(3).Quality manual (品质手册)
(4).Procedure documents(程序文件)
(5).RoHS control procedure(RoHS管控程序)
(6).Certificati***(体系证书)
(7).3rd party or other EU&US customer factory audit report & CAPA (第三方或其他欧***户审厂报告及纠正预防措施)
2.R&D department(研发部):
One of Casino model development documents. (The documents requested in the R&D procedure)(Casino的其中一个产品的相关技术开发文件。)
3.Purchasing department(采购部):
(1).Acceptable vendorlist(合格供应商名单)
(2).Two RoHS raw material supplier audit reports (done by yourselves), third party RoHS testing reports and contracts (两份你方对RoHS材料供应商的审核报告,第三方RoHS测试报告和合同)
(3).Supplier evaluation list (对合格供应商进行评估的记录)
4.Engineering department:
(1).Calibrated equipment list(生产设备的校验纪录。)
(2).Machines maintenance plan / record(生产设备维护***纪录)
(3).Equipment calibration plan / report(测量仪器年审计划及审核报告)
(4).Certification of calibrator (内校人员资格证书)
5.PMC:
Production planning for previous 3 months and this month(前三个月及本月生产计划)