GF Series waste oil dry air generator/oil purification
I Brief Introduction
GF Series waste oil dry air generator/oil purification is suitable for supplying dry air which keeps the power equipments’ inner parts from moisture in the maintenance of transformer, reactor and other big power facilities. Maintenance staff will not be short of oxygen working inside the equipment. It is more reliable, economic, convenient and safer than nitrogen.
II GF Series of different type
Item |
Parameter |
Model Unit |
GF-50 |
GF-100 |
GF-150 |
GF-200 |
|
Technical Parameter |
Flow |
M³/h |
50 |
100 |
150 |
200 |
|
Working Pressure |
Mpa |
0.6~0.8 |
|||||
Pressure Drop |
Mpa |
0.05 |
|||||
Noise |
dB(A) |
70 |
|||||
Working Power |
KW |
380V-50Hz 3 Phase 4 Wire |
|||||
Total Power |
KW |
12 |
19 |
22 |
26 |
||
Size |
Length |
cm |
215 |
215 |
230 |
230 |
|
Width |
cm |
155 |
155 |
165 |
165 |
||
Height |
cm |
230 |
230 |
230 |
230 |
||
Diameter |
DN |
32 |
40 |
50 |
50 |
||
Weight |
Kg |
900 |
980 |
1030 |
1050 |
||
After Treatment Index |
Discharge Pressure |
Mpa |
0.02~0.03 |
||||
Dew Point |
°C |
-50°C ~ -70°C |
|||||
Particle |
um |
0.01 |
|||||
Oil content in air outlet |
ppm |
0.01 |
III Iron Package
IV Company Scan
V End User Feedback
VI Why Choose Us:
1. The warranty period is 12 months.
2. We supply repairing parts for product's life time long and technical instruction.( free within the warranty period and charge beyond warranty period).
3.All our products h***e been run well and h***e been adjusted to good state before go to market. Operator only need to do as the instruction manual by pulling the butt*** and add right amount of additives. If some parts broken, operator just need to remove bolts and change new. Please note: the operation and repair is very simple.
4. When the machine send to your company . You can arrange your engineer to our company to learn operate the machine . We will arrange our engineer to teach your company engineer to operate the whole machine . You only need to pay your engineer to China the air tickets fee , hotel fee and food , It is ok !
5. We also can arrange our engineer to your country . You need to pay the air tickets fee , hotel fee ,food .